Projects
TEPL has recently completed following projects from designing to commissioning stage:
No. | Company | Plant / Capacity | Product | Country |
1. | Malaysian Palm Oil Board | Pilot Plant | MPR for Alkoxylation | Malaysia |
2. | Carotino SDN. BHD. | Continuous Fixed Bed Hydrogenation Plant, 200 TPD | Hydrogenation of Acid Methyl Esters | Malaysia |
3. | Invagro LDA | Edible Oil Plant, 100 TPD | Edible Oil | Mozambique |
TEPL is a consultant to the International Finance Corporation (IFC), Washington and The Africa Project Development Facility (APDF) for projects in the African subcontinent. The list of projects that TEPL has interacted on for IFC/APDF are as follows :
Year | Client/Location | Sponsor | Assignment |
1994 | EcosamSambava, Madagascar | APDF | Technical feasibiltiy reportfor soap plant |
1994 | Abbey Preparations Pvt. Ltd.Ruwa, Zimbabwe | APDF | Technology transfer forsoaps/detergents |
1994 | Amka Products Pty. Ltd.Johannesburg, South Africa | EXIM/APDF | Technology transfer fordetergent powders |
1995 | Nyakato Soap Industries Ltd.Mwanza, Tanzania | APDF | Techno-Economic Feasibilitystudy for soap project |
1996 | Plaspemba Lda.Pemba, Mozambique | APDF | Techno-Economic Feasibilitystudy for soap project |
1996 | Meta Products pvt. Ltd.Kampala, Uganda | APDF | Feasibility study for soap &bottled water project |
1997 | Dan Technocraft Pvt. Ltd.Makele, Ethiopia | IFC | Techno-Economic Feasibilitystudy for soap project |
1998 | Sociedade De Saboes De AngolaLuanda, Angola | IFC | Techno-Economic Feasibilitystudy for soap project |
1999 | Gamsoap Company Ltd.Kinifing Industrial EstateGambia | IFC | Techno-Economic Feasibility study for soap and detergent |